2020 – March

Manual OS 10 System for Car Parks

for multi storey car parks for exposed and intermediate decks and sidewalks on bridges with pedestrian and vehicle traffic.

Our manual OS 10 system for car parks installed at a private parking garage in Landshut

VIASOL DECK rapid M - fast and low temperature curing (open to traffic after 48 hours), manual processing, highest wear resistance, 0% plasticizer, 90% sand reduction, Short installation times,... 

Safe into the future

 


Products & systems for this article


Systems



Products