2020 – March
Manual OS 10 System for Car Parks
for multi storey car parks for exposed and intermediate decks and sidewalks on bridges with pedestrian and vehicle traffic.
Our manual OS 10 system for car parks installed at a private parking garage in Landshut
VIASOL DECK rapid M - fast and low temperature curing (open to traffic after 48 hours), manual processing, highest wear resistance, 0% plasticizer, 90% sand reduction, Short installation times,...
Safe into the future